E-6 Color Slide Developing

Dominik Haudenschild, December 3, 1993 at CBRC

Preheat bath and all solutions to 40°C.

T • Load Ektachrome film onto reel in Total Darkness

O

T • (1) First Developer: in Total Darkness

A Roll 1 _______ 5’ 15"

L Roll 2 _______ 5’ 15"

Roll 3 _______ 5’ 30"

Roll 4 _______ 5’ 30"

Roll 5 _______ 5’ 45"

Roll 6 _______ 5’ 45"

D Agitate by 2 inversions every 30 seconds

A

R

K • Wash: running warm water 1 to 3 minutes

in Total Darkness

(2) Color Developer: 5' 30"

Agitate by 7-8 initial inversions, then 2 every 30"

After film has been in #2 for 30 seconds, lights can be turned on.

Wash: running warm water 1 to 3 minutes

(3) Bleach-Fix: 10 minutes (minimum)

Agitate, make sure to tap bubbles away from film

 

• Final Wash: 4 minutes (minimum)

(4) Stabilizer II: 1 minute (minimum)

• Dry: By hanging in dust free area until dry